Precast concrete moves much of the work into the factory: elements are cast under controlled conditions, then lifted and connected on site.

Engineering overview
A precast element is lifted out of its mould, stacked, transported, hoisted and connected before it ever carries the loads of the finished building. Each of those stages loads it differently — often more severely than its final use — so each is a design case in its own right.
The connections decide what kind of structure the elements become. Simple bearing connections make a pinned structure that needs walls, cores or bracing for stability; moment-resisting connections make a frame. That choice shapes the whole design.
In return, factory casting brings consistent quality, fast erection and a programme that is less dependent on site conditions — particularly valuable where many elements repeat.
01
Precast columns, beams, slabs and wall panels
The main structural elements, designed for both their temporary and their permanent condition.
02
Hollow-core and double-tee units
Long-span floor and roof units, with their bearings, ties and any structural topping.
03
Corbel and dowel connections
Bearing connections that transfer vertical and horizontal forces between elements.
04
Stability during erection
Temporary bracing and erection sequence so that the partly built structure stays stable at every step.
Technical illustration
A precast element is designed for lifting from the mould, transport and storage, erection with temporary support, and the final connected structure — each loads it differently. Schematic only.

Structural systems
Precast frames
Columns with corbels supporting beams and floor units, stabilised by cores, walls or connections.
Hollow-core floors
Voided slab units spanning between beams or walls, tied together to act as a diaphragm.
Double-tee roofs and floors
Ribbed units for longer spans and heavier loads.
Wall panel structures
Load-bearing or cladding panels connected to the frame or to each other.
Engineering considerations
01
Handling and lifting
Lifting points, demoulding strength and dynamic effects during lifting can govern reinforcement in slender elements.
02
Temporary stability
Until connections are complete, columns and walls rely on temporary props and bracing; the erection sequence is part of the design.
03
Connection design
Corbels and dowels carry concentrated forces; their geometry, reinforcement and bearing pads decide how forces pass between elements.
04
Tolerances
Factory and site tolerances accumulate. Bearing lengths and joint widths must still work when elements are at the limits.
05
Robustness and tying
Ties between elements give the structure continuity, so that local damage does not lead to disproportionate collapse.
06
Repetition
Economy comes from repeated element types; the structural layout is planned with that in mind.
Connections
A corbel projecting from a column, a dowel through a beam end, a bearing pad between them — these few elements decide how load passes from floor to column and how the building resists horizontal forces.
They also have to be built from both sides: cast into one element in the factory and engaged by another on site, within tolerance.

Explore in 3D
Explode the model to separate columns, beams, floor units and their connections.

A generic teaching model — not a specific ARM Structures project.
Visual record



Technical approach
Element layout
Divide the structure into repeatable precast elements.
Stage-by-stage design
Design each element for demoulding, handling, transport and erection.
Connections
Design the connections and the final connected structure.
Erection stability
Set out temporary stability during erection.
Applications
Repetitive building forms
Buildings with many identical bays, floors or panels.
Industrial and storage buildings
Frames and floors where speed and robustness matter.
Programme-critical projects
Projects that benefit from moving work off site.
Project references
Project references are linked here only where a project’s verified description supports the connection to this service. ARM’s full portfolio of eighteen projects — industrial, commercial, residential and specialised structures — is on the projects page.
Browse all projectsDeliverables
The deliverables for each commission are agreed with the client at the outset, according to the project’s stage and needs.

Economical long-span steel buildings with tapered frames.
Key elements: Tapered framesPurlins & girtsBracing

Thinner slabs and longer spans with stressed tendons.
Key elements: Flat slabsTendon layoutsLong-span beams

Concrete and steel combined, each where it works best.
Key elements: RCC coresSteel floors & roofsEmbeds
Start a conversation
Tell us about the building and how much of it repeats, and we’ll discuss where precast elements and connections would work.