Service 04: Pre-Engineered Building (PEB) Systems
Economical long-span steel buildings with tapered frames.
Key elements: Tapered framesPurlins & girtsBracing
Division 02 · Service 05 of 12 · Thinner slabs · Longer spans
Post-tensioning pre-loads concrete with high-strength tendons, counteracting gravity to allow longer spans, thinner slabs and better control of deflection and cracking.

Engineering overview
In a post-tensioned slab, high-strength steel tendons are draped through the concrete in a curved profile and stressed after it has gained strength. Pulled tight, the curved tendon pushes upwards on the slab between supports — an internal load that counteracts much of the slab’s own weight.
Because part of the gravity load is balanced, slabs can be thinner and spans longer than in conventional reinforced concrete, with better control of deflection and cracking. That means lower building heights, fewer columns and more flexible floors.
The benefits come with design obligations of their own: concentrated anchorage forces, prestress losses, restraint to the slab’s shortening, and the need to keep a permanent record of where the tendons run.
01
Post-tensioned flat slabs
Flat slabs with tendons profiled between columns, for thin floors and clear soffits.
02
Banded and distributed tendon layouts
Tendons concentrated in bands over column lines in one direction and distributed in the other — or arranged to suit the floor plan.
03
Transfer and long-span beams
Post-tensioned beams carrying heavy loads over long spans or transferring columns.
Technical illustration
Stressed along a curved profile — high over supports, low at mid-span — a tendon exerts an upward pressure on the concrete that balances part of the slab’s weight. Anchorages at each end apply the force. Schematic only.
Engineering considerations
01
Load balancing
The tendon profile and force are chosen to balance a chosen portion of the permanent load; the remainder is carried as in ordinary reinforced concrete.
02
Prestress losses
Friction, anchorage set, elastic shortening, creep, shrinkage and relaxation all reduce the tendon force over time and are allowed for in design.
03
Anchorage zones
Each anchorage applies a concentrated force to the slab edge; bursting and spalling reinforcement is needed to spread it safely.
04
Restraint to shortening
Prestress shortens the slab. Stiff walls and cores that resist this movement can crack or attract force, so their location and connections are planned with the tendons.
05
Punching shear
At columns the slab is checked for punching shear; tendons passing near the column help but do not remove the need for the check.
06
Openings and future changes
Tendon positions must be recorded and openings planned, because cutting a tendon later is a serious structural intervention.

Anchorages
All the prestress enters the slab through its anchorages. Behind each one the concrete must carry a concentrated force without splitting, which calls for carefully detailed bursting reinforcement and concrete that has reached the required strength before stressing.
Edge geometry, anchorage spacing and the stressing sequence are therefore designed together.

Structural systems
Flat plates
Uniform post-tensioned slabs on columns, with tendons in two directions.
Banded slabs
Wide, shallow beam bands with concentrated tendons, and thinner slabs between them.
Post-tensioned beams
Beams with draped tendons for long spans, car parks and transfer levels.
Explore in 3D
Open the model to see the tendon profiles and anchorages within the floor.

A generic teaching model — not a specific ARM Structures project.
Visual record



Technical approach
Floor layout
Agree spans, slab type and the positions of openings and cores.
Tendon layout
Set tendon profiles and layouts to balance the permanent load.
Staged effects
Check the slab at transfer of prestress and at each stressing stage.
Openings coordination
Coordinate openings and services with the tendon layout.
Applications
Commercial floors
Office and retail floors where clear, column-free space has value.
Car parks
Long spans between columns for parking and circulation.
Column-free spaces
Halls and large rooms where intermediate columns are unwanted.
Project references
Project references are linked here only where a project’s verified description supports the connection to this service. ARM’s full portfolio of eighteen projects — industrial, commercial, residential and specialised structures — is on the projects page.
Browse all projectsDeliverables
The deliverables for each commission are agreed with the client at the outset, according to the project’s stage and needs.

Economical long-span steel buildings with tapered frames.
Key elements: Tapered framesPurlins & girtsBracing

Factory-cast elements designed for lifting and connection.
Key elements: Precast elementsHollow-core unitsCorbel connections

Concrete and steel combined, each where it works best.
Key elements: RCC coresSteel floors & roofsEmbeds
Start a conversation
Tell us the spans, floor use and any constraints on depth or openings, and we’ll discuss whether post-tensioning suits the project.