Pre-Engineered Building (PEB) Systems

Pre-engineered buildings use tapered built-up frames and light-gauge secondary members, putting steel where the forces are greatest for economical long-span enclosures.

Clad pre-engineered steel building with a large open bay showing the steel frames inside
Representative image Illustrative artwork — not a photograph of an ARM project.

Engineering overview

Steel where the bending is — and only there.

A pre-engineered building replaces rolled sections with frames built up from plate. The web depth can then follow the bending moment along the frame: deep at the eaves haunch, shallower towards mid-span and at the base. The result is a long-span frame with much less steel than a uniform section would need.

Light-gauge cold-formed purlins and girts carry the roof and wall sheeting to the frames and restrain their flanges. Because the whole building is light, wind uplift and stability — not gravity — often govern the design.

Standardised frames, bay spacings and secondary members make PEB fast to fabricate and erect, which is why it is widely used for warehouses, factories and logistics buildings.

Scope of services

  1. 01

    Tapered primary frames

    Built-up frames whose depth varies with the bending moment, for single and multiple spans.

  2. 02

    Purlins, girts and sag rods

    Cold-formed secondary framing that carries the cladding and restrains the primary frames.

  3. 03

    Rod and portal bracing

    Longitudinal stability through rod bracing or, where openings prevent it, portal bracing.

  4. 04

    Crane and mezzanine provisions

    Frames, brackets and floors designed for overhead cranes and mezzanine levels where required.

Technical illustration

The frame depth follows the bending moment

Bending in a portal rafter is greatest at the eaves haunch and smaller towards mid-span, so the built-up section is deepest where the moment is largest. Purlins and girts restrain the frame and carry the sheeting. Schematic only.

The frame depth follows the bending momentBENDING MOMENT ALONG THE FRAME (MAGNITUDE)Deepest at the eaves haunch, where bending peaksShallower towards mid-spanPurlins carry the roof and restrain the rafterFlange brace — restrains the inner flange under upliftGirts carry the wall claddingNarrow base — often pinned
Technical diagram

Secondary framing

The light members do structural work

Purlins and girts are often treated as cladding supports, but in a PEB they also brace the main frames. Under wind uplift the bottom flange of the rafter goes into compression, and only the flange braces from the purlins stop it from buckling.

Sag rods and bridging keep the cold-formed sections themselves stable. Every one of these small members has a role in the overall stability of the building.

PEB roof purlins and flange braces seen from belowConceptual illustration
Conceptual 3D illustration for Pre-Engineered Building (PEB) SystemsConceptual illustration

Structural systems

Systems and where they apply

  1. 01

    Clear-span frames

    A single tapered frame across the full width — maximum flexibility of the floor.

  2. 02

    Multi-span frames

    Interior columns shorten the rafter span and reduce frame weight for very wide buildings.

  3. 03

    Lean-to and extensions

    Secondary bays attached to a main frame, often for offices or loading areas.

  4. 04

    Crane-bearing PEB

    Frames with brackets and runway beams for overhead cranes, with stiffer columns and bracing.

Explore in 3D

Primary frames, secondary framing and bracing

Switch layers to see the tapered frames, the purlins and girts, and the bracing that holds them in line.

Conceptual model: Pre-Engineered Building (PEB) SystemsConceptual model

A generic teaching model — not a specific ARM Structures project.

Engineering considerations

What the design has to resolve

  1. 01

    Wind uplift

    Light roofs can be lifted by wind suction; purlins, connections and anchorage are checked for reversal of load.

  2. 02

    Flange restraint

    Under uplift the inner flange of the rafter goes into compression; flange braces from the purlins restrain it.

  3. 03

    Secondary member stability

    Cold-formed purlins and girts rely on sag rods, bridging and the sheeting for their stability.

  4. 04

    Anchorage and base fixity

    Base conditions — pinned or fixed — change frame weight and foundation design and must be agreed between both.

  5. 05

    Openings and bracing

    Large doors can interrupt the bracing line; portal bracing provides stability where rods cannot go.

  6. 06

    Future loads

    Cranes, mezzanines, solar panels or services added later are far easier to accommodate if they are designed in from the start.

Technical visual storytelling

Pre-Engineered Building (PEB) Systems in context

Systems, details and building types this service addresses.

  • Aerial view of a large pre-engineered industrial building with loading bays
  • Steel portal frames with rafters, purlins and a crane beam inside an industrial building
  • Aerial view of a large logistics warehouse with truck docks

Conceptual illustrations — not photographs of ARM Structures projects.

Technical approach

How the work is carried out

  1. 01

    Frame and bay layout

    Set the spans, bay spacing and eave height for the building’s use.

  2. 02

    Primary frames

    Design the tapered frames for the governing load combinations.

  3. 03

    Secondary framing and bracing

    Design purlins, girts, sag rods and bracing.

  4. 04

    Anchorage

    Design base connections and the anchorage into the foundations.

Applications

Where this work is used

  • Warehouses

    Large clear floors for storage and racking.

  • Factory sheds

    Production buildings, with cranes or mezzanines where needed.

  • Logistics and storage buildings

    Fast-track enclosures for distribution and storage.

Project references

Project references are linked here only where a project’s verified description supports the connection to this service. ARM’s full portfolio of eighteen projects — industrial, commercial, residential and specialised structures — is on the projects page.

Browse all projects

Deliverables

What you receive

The deliverables for each commission are agreed with the client at the outset, according to the project’s stage and needs.

Start a conversation

Planning a warehouse or factory shed?

Share the plan size, clear height and any crane or mezzanine requirements, and we’ll discuss the PEB frame that suits them.