
Service 04: Pre-Engineered Building (PEB) Systems
Economical long-span steel buildings with tapered frames.
Key elements: Tapered framesPurlins & girtsBracing
Division 02 of 5 · 4 services

Advanced structural solutions for demanding spans, complex forms and specialised building requirements.
Structural systems chosen for what conventional framing does less well — long clear spans, thin floors, repetitive factory-made elements and combinations of concrete and steel.
Technical scope
Pre-engineered, post-tensioned, precast and hybrid systems each trade a little design complexity for a large gain in span, speed or efficiency. They share a need for early system decisions and careful attention to stages, connections and interfaces.
01
System comparison
Option studies that weigh span, depth, programme and material use before the structure is fixed.
02
Stage-dependent design
Stressing, lifting, erection and composite stages checked as well as the completed structure.
03
Connections and interfaces
Concrete–steel interfaces, precast joints and anchorages designed as primary structural elements.
04
Long-span behaviour
Deflection, vibration and stability controlled for column-free spaces.
Services in this division
Open a service for its engineering approach, applications, process and related projects.

Economical long-span steel buildings with tapered frames.
Key elements: Tapered framesPurlins & girtsBracing

Thinner slabs and longer spans with stressed tendons.
Key elements: Flat slabsTendon layoutsLong-span beams

Factory-cast elements designed for lifting and connection.
Key elements: Precast elementsHollow-core unitsCorbel connections

Concrete and steel combined, each where it works best.
Key elements: RCC coresSteel floors & roofsEmbeds
In context



Conceptual illustrations — not photographs of ARM Structures projects.
Applications
Project references

IndustrialUnder construction
AAVIN
View project
Start a conversation
Tell us the spans, loads and programme, and we’ll discuss whether a PEB, post-tensioned, precast or hybrid system suits the project.