
IndustrialUnder construction
Project 1: Milk Processing Facility
AAVIN
- Location
- Madhavaram, Chennai, Tamil Nadu
- Footprint
- 4,810 m²
View project
Project 12
JB Kanan
Structural design of a ground-plus-two-storey warehouse building.

Choose “3D Interactive Model” to rotate, zoom and select components. Drag to rotate, pinch or scroll to zoom.
Visual Reconstruction from ARM’s Project Screenshot — Not a Verified Engineering Model.
Rebuilt from ARM’s structural model screenshot: dense 7 × 6 RCC column grid with beam grids at the two lower levels, first and second floor (G+2), columns continuing to the roof, and the muted-pink steel lattice roof — a pitched lattice truss along the length on every column line with web members and cross ties. Bay ratios, plan proportions and heights come from a perspective solve of the single view, scaled to the verified 1,373.625 m². Truss depth, panel spacing and member sizes are visual approximations; no cladding or sheeting is modelled.
Storage on upper floors means designing for heavy, concentrated and frequently changing loads.
ARM Structures carried out the structural design of this G+2 warehouse building.
From ARM Structures’ project presentation. Site photographs have not yet been supplied.
(opens full-size image)
IndustrialUnder construction
AAVIN
View project

IndustrialUnder construction
CKB
View project

IndustrialUnder construction
Jothi Industries
View project
Start a conversation
Share the outline of your project — its type, size and stage — and we’ll respond about its structural engineering requirements.